Sprint Retrospective template
What went well, what to improve, actions. Open it in the editor, replace what needs replacing, and export a typeset PDF — free, no signup, nothing uploaded.
Preview
Sprint 24 Retrospective
Sprint: 24 (15–26 June 2026) · Facilitator: Tom Brennan · Present: 6 of 7
What went well
- The billing soak test caught the refund edge case before customers did.
- Pairing on the connection-pool change spread the context across three people instead of one.
- We finished the sprint without a single weekend deploy.
What did not
- Two stories carried over because the design was still moving on day four.
- The staging environment was down for most of Tuesday and nobody owned fixing it.
- Standup routinely ran to 25 minutes.
What we are changing
| Change | Owner | By |
|---|---|---|
| No story enters a sprint without a signed-off design | Dana | Sprint 25 planning |
| Rotate a named "environment owner" each sprint | Tom | Sprint 25 |
| Hard-stop standup at 10 minutes; park the rest | Whole team | Immediately |
Still open
- Do we split the platform board from the product board? Revisit at Sprint 26.
Kept from last retro: the "no story without a design" rule failed once this sprint. If it fails again in Sprint 25, we stop treating it as a rule and find out what is actually blocking it.
The Markdown source
---
skin: notebook
accent: #f59e0b
title: Sprint 24 retrospective
date: 2026-06-26
---
# Sprint 24 Retrospective
**Sprint:** 24 (15–26 June 2026) · **Facilitator:** Tom Brennan · **Present:** 6 of 7
## What went well
- The billing soak test caught the refund edge case *before* customers did.
- Pairing on the connection-pool change spread the context across three people
instead of one.
- We finished the sprint without a single weekend deploy.
## What did not
- Two stories carried over because the design was still moving on day four.
- The staging environment was down for most of Tuesday and nobody owned fixing it.
- Standup routinely ran to 25 minutes.
## What we are changing
| Change | Owner | By |
| :----- | :---- | :- |
| No story enters a sprint without a signed-off design | Dana | Sprint 25 planning |
| Rotate a named "environment owner" each sprint | Tom | Sprint 25 |
| Hard-stop standup at 10 minutes; park the rest | Whole team | Immediately |
## Still open
- Do we split the platform board from the product board? Revisit at Sprint 26.
> Kept from last retro: the "no story without a design" rule failed once this
> sprint. If it fails again in Sprint 25, we stop treating it as a rule and find
> out what is actually blocking it.
Copy it anywhere Markdown works — or open it pre-loaded in Scripto with the button above.
Related templates
Ship your sprint retrospective today.
One click opens this template in the editor with a live paginated preview.